How to Prep Your Home Before the Renovation Crew Arrives
DECEMBER 01, 2025

The demolition day arrives. Workers show up. Sledgehammers swing. Walls come down. This is the moment most homeowners think of as the beginning of their renovation. It's actually closer to the midpoint—and if you haven't prepared properly, it's the moment when preventable problems begin compounding.
The remodels that go smoothly, stay on budget, and produce satisfaction aren't distinguished by better contractors or better luck. They're distinguished by better preparation. The weeks before demolition begins—the period when nothing visible is happening—determine whether the construction phase proceeds efficiently or degenerates into chaos, cost overruns, and relationship strain.
Most homeowners underestimate both the logistical complexity and emotional toll of living through renovation. The kitchen you use every day will be inaccessible. Strangers will occupy your home for hours daily. Noise will disrupt work calls and sleep patterns. Dust will infiltrate spaces you thought were sealed. These disruptions are manageable with preparation; without it, they overwhelm.
What proper pre-demolition preparation prevents is substantial: cost overruns from scope confusion or change orders without clear terms; safety hazards from inadequate site preparation or unclear protocols; relationship damage with contractors from communication failures; health impacts from dust exposure or poor air quality management; asset damage to furniture, finishes, and valuables; and stress amplification from preventable chaos.
This checklist provides the fifteen essential preparation steps to complete before any demolition occurs. Each step addresses a failure mode that derails unprepared projects. Completing them all positions you for a construction phase that—while never effortless—proceeds with the controlled progress that successful renovations require.
Before any physical work begins, verify that the planned work is structurally sound and legally permitted. Skipping this step creates risks that range from inconvenient to catastrophic.
A home inspection before major work provides baseline understanding of your home's current condition. This inspection differs from a purchase inspection—it focuses specifically on areas the renovation will affect. A structural engineer may be warranted for projects involving wall removal, foundation work, or load-bearing modifications. The HUD building code resources provide information on residential construction standards that inform what modifications require professional engineering review.
Permit requirements vary by jurisdiction and project scope. Most work affecting structure, electrical, plumbing, or HVAC requires permits. Cosmetic work—paint, flooring, fixtures—typically doesn't. But the line between cosmetic and permitted work isn't always obvious. Moving a light fixture might be cosmetic; moving an electrical panel isn't. Your contractor should know what requires permits; if they suggest skipping permits to save money or time, that's a red flag indicating potential problems with their professionalism or your project's compliance.
Permit application timelines vary dramatically by location. Some jurisdictions issue permits in days; others take weeks. Projects requiring plan review by structural engineers or fire marshals take longer. Waiting until you're ready to start construction to apply for permits creates delays that disrupt schedules and may trigger penalties if contractors have been booked for specific dates.
The permit process also surfaces potential problems before they become expensive. The inspector who reviews your permit application may identify code compliance issues that affect your plans—better to discover these before demolition than during construction when addressing them becomes far more complicated.
Scope ambiguity is the leading cause of renovation budget overruns and homeowner-contractor conflict. Before demolition begins, every aspect of the project should be documented with clarity that leaves no room for misunderstanding.
Detailed scope documentation specifies exactly what work will be performed, what materials will be used, and what the finished result will include. "Renovate kitchen" is not detailed scope. A document that specifies cabinet manufacturer, style, and count; countertop material and edge profile; specific appliances to be installed; flooring material and installation pattern; lighting fixtures and locations; plumbing fixtures and finishes; and every other element—that's detailed scope.
The documentation should address both what's included and what's excluded. If the scope includes cabinet installation but excludes interior lighting inside cabinets, that exclusion should be explicit. If the scope includes running electrical for a new island but excludes installing a specific fixture, state that. Assumptions about what's "obviously" included or excluded generate disputes when those assumptions differ between parties.
Budget planning should include contingency of at least fifteen to twenty percent beyond the contracted amount. The Remodeling Magazine Cost vs. Value Report provides data on typical renovation costs that helps calibrate expectations, but every project encounters surprises. Hidden conditions, scope additions that seem minor but accumulate, and market price fluctuations all affect final cost. A budget without contingency isn't a realistic budget—it's a hope.
Change order terms deserve specific contractual attention. Change orders—modifications to the original scope during construction—are inevitable in most projects. The contract should specify how change orders are documented (written approval required before work proceeds), how pricing is determined (hourly labor plus materials at specified markup? Pre-approved unit prices?), and what happens if homeowner and contractor disagree on change order pricing. Without clear terms, every change becomes a negotiation that strains the relationship.
The contractor discussion checklist before signing should cover what specifically is included in this price, what typical additional costs arise on similar projects, how change orders are handled, what the payment schedule is and what triggers each payment, what happens if the project runs past the scheduled completion date, and what warranty covers the work.
The contractor you select will have intimate access to your home for weeks or months. Verifying their credentials and insurance protects you from risks that range from financial to physical.
Licensing verification confirms that the contractor meets minimum legal requirements for operating in your jurisdiction. Licensing requirements vary by state and locality, but most require contractors to demonstrate competency through examination, experience, or both. The National Association of Home Builders (NAHB) provides resources on contractor qualifications; the National Association of the Remodeling Industry (NARI) offers certification programs that indicate commitment to professional standards beyond minimum licensing requirements.
Bonding protects homeowners if contractors fail to complete work or pay subcontractors and suppliers. A bond is a form of insurance that provides compensation if the contractor defaults. Not all jurisdictions require bonding, but contractors who maintain bonds demonstrate financial stability and commitment to accountability.
Liability insurance protects against property damage and injuries that occur during construction. If an uninsured worker falls and is injured on your property, you may face liability. If construction causes damage to a neighbor's property and the contractor is uninsured, you may be responsible. Request certificates of insurance and verify that coverage is current—not just that the contractor claims to have coverage.
Workers' compensation coverage specifically protects against employee injuries. Even if the contractor has general liability coverage, workers' comp is a separate requirement. Confirm that the contractor maintains workers' compensation insurance that covers all workers on your project, including subcontractors. The OSHA construction safety guidelines establish workplace safety standards that proper coverage should complement.
Red flags during credential verification include reluctance to provide documentation, expired or inadequate coverage amounts, inability to provide licensing information, and pressure to skip verification because "it's not necessary." Professional contractors expect verification requests and provide documentation readily.
Before any work begins, conduct a detailed walkthrough with your contractor to establish shared understanding of the project, identify potential risks, and create documentation that protects both parties.
Identifying risk zones means flagging areas where construction activity could cause unintended damage. The contractor needs to know about the hardwood flooring that extends into the adjacent room, the antique light fixture that vibrates when doors slam, the irrigation system buried near the exterior wall that's coming down. Walk through the entire affected area and every pathway workers will use, noting items or conditions that warrant protection or caution.
Clarifying demolition boundaries establishes exactly what gets removed and what stays. The wall that's "coming down" may contain elements that are being preserved—electrical boxes, plumbing, architectural details. Mark these boundaries physically with tape or paint so workers on-site understand the limits of their work even if they weren't present for planning conversations.
Photo documentation of existing conditions before work begins serves multiple purposes. It records the baseline against which completion will be measured. It provides evidence if disputes arise about pre-existing versus construction-caused damage. It captures details that may become relevant later—the exact position of elements being modified, the condition of finishes adjacent to work zones, the state of items that will be temporarily moved.
Document systematically. Photograph every room that workers will access or pass through. Photograph all surfaces in work zones. Photograph items of value that remain in or near work areas. Include wide shots establishing context and close-ups capturing condition details. Date-stamp or document when photos were taken. Store copies off-site so they're accessible if something happens to your local files.
The walkthrough also provides opportunity to discuss logistics: where workers enter the home, where they take breaks, where materials will be staged, where debris will accumulate before removal. These practical details affect daily disruption and deserve explicit agreement before work begins.
Construction generates dust that, without containment measures, infiltrates every space in your home and creates ongoing air quality problems that persist well after construction ends. A specific mitigation plan addresses this hazard proactively.
The EPA indoor air quality guidelines document how construction activities affect indoor environments and what mitigation measures reduce exposure. Dust generated during renovation can include particulates that cause respiratory irritation and, depending on what materials are being disturbed, potentially hazardous substances like silica, lead, or asbestos.
Sealing areas between construction zones and living spaces prevents dust migration through normal pathways. Plastic barriers across doorways provide visual separation but may not create adequate seal. Professional containment uses barriers that seal to floors, ceilings, and walls; zipper doors that allow passage without breaking the seal; and tape specifically designed for dust containment rather than standard masking tape that fails in dusty conditions.
HVAC protection prevents dust from entering ductwork and distributing throughout the house. At minimum, seal all registers in the work zone with plastic and tape. For significant projects, consider sealing return air grilles and shutting down the central system during the dustiest phases. A single HVAC cycle with contaminated return air can spread dust throughout every room the system serves—and that dust settles inside ductwork where it's extremely difficult to remove.
HEPA filtration within work zones captures airborne particles before they can migrate. Portable HEPA air scrubbers sized for the work zone volume provide continuous air cleaning. For projects generating significant dust—demolition, drywall work, tile cutting—negative air machines that exhaust filtered air outdoors create pressure differential that prevents dust from escaping the work zone.
The mitigation plan should specify what containment barriers will be installed and by whom, how HVAC will be protected, what filtration equipment will operate during construction, what daily cleanup protocol will occur, and who is responsible for mitigation—contractor or homeowner.
Items remaining in or near construction zones face damage risk from dust, debris, impact, and the general chaos of active work sites. A protection strategy addresses each risk category.
Relocation is the most reliable protection. Anything that can be moved out of the construction area and adjacent spaces should be moved. This includes furniture, rugs, artwork, electronics, books, decorative items, and anything else of value or difficulty to clean. Move these items before construction begins—attempting to relocate things after dust has spread extends the contamination to new spaces.
Items that can't be relocated need in-place protection. Professional approaches layer protection: a soft first layer (moving blanket, paper, or breathable fabric) against the item to prevent scratching and moisture trapping; a second layer of heavy plastic (6 mil minimum) completely enclosing the item with sealed seams; and if necessary, a third layer of rigid protection for impact resistance. Simply throwing plastic over furniture provides inadequate protection—edges gap, seams separate, and dust finds pathways through.
Anti-static techniques matter for electronics. Standard plastic can generate static charges that attract dust particles, potentially contaminating sensitive equipment through static cling even when physical barriers seem intact. Anti-static plastic sheeting or anti-static bags for smaller electronics reduce this risk.
Storage solution planning determines where relocated items will go. Some items can move to unrenovated areas of the home. Others may need off-site storage—a storage unit, a neighbor's garage, or a climate-controlled facility for items sensitive to temperature and humidity. Large furniture may require professional movers to relocate safely. Plan storage logistics before demolition creates the pressure to get items out of the way immediately.
The protection priority hierarchy: first, remove valuable and irreplaceable items entirely; second, remove easily damaged items (electronics, fabrics, paper goods); third, protect in place items too large or fixed to relocate; fourth, accept that low-value items in the work zone may sustain some impact.
Living through renovation means finding alternatives for spaces that will be inaccessible. Planning these alternatives before construction begins prevents daily scrambling that amplifies stress.
The CDC provides guidance on household environments and wellness. Their principles—maintaining basic hygiene capabilities, preserving sleep quality, ensuring safety—apply directly to temporary living arrangements during renovation. Cutting corners on temporary living setup affects health and wellbeing throughout the project duration.
Kids and pets adaptation requires particular attention. Children need stable routines even when home spaces are disrupted. Identify where homework happens, where quiet activities occur, where meals are eaten. Establish these alternative spaces before chaos begins so transitions feel managed rather than desperate. Pets face stress from disruption, noise, and strangers in the home. Consider whether pets should stay elsewhere during the noisiest phases; if they stay, create refuge spaces away from construction activity where they can retreat.
Plan for the duration. A one-week disruption is tolerable with improvised solutions. A three-month disruption requires sustainable arrangements that don't exhaust you before construction is halfway complete.
Construction activities affect utility systems and create safety considerations that require advance preparation. Addressing these before work begins prevents dangerous surprises.
Shut-off procedures for water, gas, and electric should be understood by homeowners before construction begins. Know where your main water shut-off is located and how to operate it. Know where your main electrical panel is and how to cut power to specific circuits or the entire house. Know where your gas shut-off is (if applicable) and understand that relighting gas appliances after shut-off may require utility company involvement.
These locations and procedures matter because emergencies during construction require immediate response. A broken water line floods quickly if you're searching for the shut-off. An electrical issue creates danger while you figure out the panel. Your contractor should know these locations, but you should too—and you should verify that access to these shut-offs won't be blocked during construction.
The FEMA home safety guidelines provide comprehensive guidance on home safety preparation. Their principles—know your systems, maintain clear access to emergency controls, ensure working safety devices—apply particularly during construction periods when risks are elevated.
Smoke detector and carbon monoxide detector relocation may be necessary if construction activities will trigger false alarms or if detectors are in demolition zones. Maintain working detection throughout the home, even if that means temporary relocation to alternative positions. The period of elevated fire risk during construction is exactly when you most need working detection—don't leave gaps.
Fire extinguisher accessibility deserves attention. Construction activities sometimes involve hot work (cutting, welding, soldering) that creates fire risk. Ensure extinguishers are available near work areas, are rated for the fire types possible, and are accessible to both workers and homeowners.
First aid supplies should be accessible and known to all parties. Construction sites generate minor injuries—cuts, splinters, bruises. Having basic first aid available prevents minor incidents from requiring external medical attention.
Clear agreements and communication protocols prevent the misunderstandings that escalate into disputes. Establish these frameworks before stress makes rational discussion harder.
Written contracts covering all scope, pricing, payment terms, timeline, and responsibilities form the legal foundation of your relationship with the contractor. Don't rely on verbal agreements or handshake deals regardless of how trustworthy the contractor seems. When disputes arise—and some will, in any significant project—written agreements determine resolution. Without written terms, disputes become contests of recollection where neither party has definitive support.
Preferred communication channels should be explicitly agreed. How will daily updates occur? Email, text, phone, or in-person at the job site? Who should the contractor contact for routine questions, and who for decisions that affect scope or budget? What constitutes urgent communication warranting interruption of work or home activities?
The decision-making hierarchy clarifies who can authorize what. If both partners in a household are involved in the renovation, who has final authority on decisions that arise during construction? Can one partner authorize changes without consulting the other? If not, what's the protocol when the contractor needs a decision and only one partner is reachable?
Emergency change approval addresses the scenario where unexpected conditions require immediate decision. The contractor discovers rotted framing behind a wall—do they stop work until you can discuss, proceed with repair under assumed authorization, or something else? Establishing this protocol before emergencies occur prevents delay and confusion when rapid response is needed.
Dispute resolution provisions in contracts establish what happens when disagreements can't be resolved through direct discussion. Mediation, arbitration, or litigation? Which jurisdiction's law applies? These provisions may never be invoked, but having them clarifies expectations and provides framework if serious disputes arise.
Understanding the project timeline in detail—not just the hoped-for completion date, but the sequence of work, critical milestones, and factors that might cause delay—enables realistic planning and reduces frustration when the inevitable variations occur.
Timeline clarity means having documented schedule that specifies the sequence of work phases (demolition, rough work, finish work, etc.), estimated duration of each phase, when key inspections occur, what milestones trigger payment, and what completion date is targeted.
This timeline should distinguish between commitments and estimates. A commitment that rough plumbing will be complete by a specific date creates accountability if it's missed. An estimate that rough plumbing should take about a week communicates expectation without the same accountability. Understanding which timeline elements are firm and which are projections helps calibrate your own planning.
Weather risk adjustments matter for projects involving exterior work or activities that require specific conditions. Concrete pouring has temperature requirements. Roofing work can't proceed in heavy rain. Exterior painting has humidity and temperature constraints. For projects with weather-sensitive phases, the timeline should indicate how weather delays affect subsequent phases and what triggers contingency plans.
Inspection timing creates schedule dependencies that homeowners often underestimate. Rough inspections must occur before walls are closed. Electrical inspections must pass before certain other work can proceed. Inspector availability varies—busy periods may mean waiting days for an inspection that delays subsequent work. Understanding these dependencies helps anticipate schedule variations.
The Harvard Joint Center for Housing Studies has documented how renovation project timelines typically evolve, noting that initial estimates often prove optimistic. Building this expectation into your planning—assuming the project will take somewhat longer than projected—reduces disappointment and enables more realistic life planning around the construction period.
Materials arriving at the wrong time or stored improperly create delays and quality problems. Coordinating delivery timing and storage conditions prevents these issues.
Timing material availability to match construction sequence prevents both premature delivery (materials sitting around getting damaged or stolen) and delayed delivery (work stopping because materials aren't available). Work with your contractor to understand when each major material category is needed and plan delivery accordingly.
Some materials have lead times that require advance ordering. Custom cabinets may take six to twelve weeks from order to delivery. Special-order windows or doors may have similar lead times. Certain flooring materials may have limited availability requiring advance purchase. The discovery that needed materials won't be available for eight weeks, made four weeks into construction, creates frustrating delays. Early identification of long-lead items enables ordering that aligns with project timeline.
Climate-controlled storage requirements affect some materials. Hardwood flooring typically requires acclimation—storage in the installation environment for a period (often a week or more) so the wood reaches equilibrium with ambient conditions before installation. Installing without acclimation can cause warping, gaps, or buckling as the wood adjusts after installation. Manufacturer recommendations specify acclimation requirements and other storage conditions.
Other materials have different storage sensitivities. Adhesives and sealants may have temperature requirements. Tile and stone should be protected from moisture and damage. Paint shouldn't freeze. Understanding each material's storage needs enables provision of appropriate conditions.
Security concerns arise when valuable materials sit on job sites. Copper plumbing, appliances, high-end fixtures, and other valuable items attract theft. Plan for secure storage of high-value materials, potentially including locked storage areas or just-in-time delivery that minimizes the period materials are vulnerable.
Renovation is physically and emotionally taxing in ways that surprise even homeowners who think they've prepared. Addressing the psychological dimensions of living through renovation prevents stress from overwhelming coping capacity.
Stress management strategy means identifying your stress responses and having plans to address them before construction amplifies everything. What activities help you decompress? Make sure those remain accessible during construction. What relationships provide support? Let those people know you may need more support during this period. What triggers escalate your stress? Plan how to avoid or manage those triggers when construction disruption makes everything harder.
Partner or family alignment discussion ensures that household members share expectations about how the renovation will affect daily life. Discuss how disruption will be shared—will one partner manage contractor interactions while the other handles child logistics, or will responsibilities be distributed differently? Discuss how decisions will be made when disagreements arise under pressure. Discuss how you'll communicate about stress without blaming each other when frustration mounts.
The mini-guide for coping with disruption includes several strategies. Maintain routines where possible—the consistent parts of your day provide psychological stability when so much else is disrupted. Accept imperfection—your home will be chaotic and your meals will be simpler than usual; fighting this reality wastes energy. Take breaks—if possible, spend occasional nights away from the construction zone to restore perspective. Focus on the outcome—visualization of the finished space provides motivation through difficult phases. Communicate with the contractor—when you're struggling, let them know; many contractors can adjust scheduling or approach to reduce particularly stressful impacts.
The emotional labor of renovation is real. Don't be surprised if you feel exhausted even when you're not doing physical work. The cognitive load of decisions, the sensory stress of noise and dust, and the displacement from normal life all consume energy that may not be apparent until you're depleted.
Renovation affects neighbors and community members who deserve advance notice and consideration. Proactive communication prevents relationship damage and may be legally required depending on your community.
Noise schedule agreement with immediate neighbors prevents complaints and maintains relationships you'll continue living with after construction ends. Share projected work hours and particularly noisy phases. Ask if there are specific times when noise would be especially problematic—someone who works from home conducting video calls, an infant's nap schedule, a night-shift worker who sleeps during the day. Accommodating these concerns where possible demonstrates respect that neighbors appreciate.
Shared parking mitigation addresses the reality that contractor vehicles and material deliveries will occupy parking space. If street parking is limited, warn neighbors and try to minimize impact. If your driveway is blocked by construction activity, identify alternative parking for your own vehicles. If delivery trucks will block the street temporarily, notify neighbors in advance.
Legal obligations in HOA-regulated communities may require formal notification or approval of construction plans. HOA rules often specify permitted construction hours, required contractor insurance, notification procedures, and aesthetic standards for exterior work. Failure to comply with these requirements can result in fines or stop-work orders that delay your project. Review HOA rules early in planning and complete any required approval processes before construction begins.
Some jurisdictions have independent noise ordinances or construction hour limitations that apply regardless of HOA status. Verify local requirements and ensure your contractor's planned schedule complies. The municipality that issues your permits may also enforce construction hour limitations—another reason to confirm permit requirements early.
Beyond legal obligations, neighborly communication simply makes the experience better for everyone. Neighbors who understand what's happening and feel their concerns were considered are far more tolerant of inevitable disruption than neighbors who feel ignored.
Even well-planned renovations encounter unexpected problems. Planning for contingencies before they occur enables faster, calmer response when surprises happen.
Backup living arrangements should be identified even if you hope not to need them. What if the renovation takes longer than expected? What if conditions in the home become intolerable during a particular phase? Having options identified—relatives' homes, short-term rentals, extended-stay hotels—enables faster decision-making if circumstances require relocation. Knowing that backup exists also reduces anxiety about worst-case scenarios.
Insurance coverage confirmation ensures that your existing homeowner's policy covers renovation activities and that appropriate coverage is in place for the specific risks construction creates. The Insurance Institute for Business & Home Safety (IBHS) provides guidance on property protection that applies during construction periods.
Review your policy for coverage gaps related to construction. Some policies exclude coverage for certain construction-related losses. Some require notification of significant renovation. Some have increased deductibles or reduced coverage during construction periods. Understanding your coverage—and purchasing additional coverage if warranted—prevents discovering coverage gaps after losses occur.
Contractor escalation contacts provide recourse if normal communication breaks down. Who do you contact if the project manager is unresponsive? Is there an owner or supervisor above the project manager? Is there a company customer service function? Having these contacts before you need them enables faster escalation if problems develop.
Documentation of everything during construction provides evidence if disputes arise later. Keep a project journal noting daily activities, decisions made, problems encountered, and how they were resolved. Save all written communications—emails, texts, written notes. Photograph progress regularly. This documentation may never be needed, but if disputes arise about what was agreed or what occurred, contemporaneous records provide the strongest support.
Before demolition begins, a final walkthrough confirms that all preparation is complete and establishes clear go/no-go criteria. This final check prevents starting construction when gaps remain that should be addressed first.
The go/no-go decision should be explicit—a defined moment when you confirm readiness rather than construction starting gradually without clear authorization. Before giving the go-ahead, verify that all permits are approved and posted, all contracts are signed and deposits paid, all protection measures are in place, temporary living arrangements are established, all affected parties have been notified, and communication protocols are confirmed with the contractor.
If any essential preparation remains incomplete, delay the start until it's addressed. The pressure to begin—contractors have scheduled crews, you're eager to get started, deposits have been paid—can push projects to start before they're ready. Resist this pressure. Delay now costs less than problems later.
The final walkthrough with the contractor should confirm mutual understanding of scope, sequence, and expectations. Walk the entire project area together. Confirm protection measures. Verify that material delivery dates are confirmed. Review the first week's schedule in detail. Ask if the contractor has any remaining questions or concerns.
This walkthrough is also the moment to confirm contact information and communication protocols. Who calls whom, when, and for what purposes? What's the emergency contact procedure? When will regular updates occur?
Document the conclusion of this walkthrough. Both parties confirming readiness to begin creates mutual accountability and clear record that construction started with proper preparation.
This printable summary captures all fifteen preparation steps in actionable form.
The weeks of preparation before demolition begins feel like waiting. Nothing visible is happening. The urgency to start—to see progress, to move toward the finished result—makes preparation feel like delay. It isn't.
The preparation period is when you prevent the problems that derail unprepared projects. Every item on this checklist addresses a failure mode that occurs regularly in renovations. Skipping preparation doesn't save time; it defers problems to later stages when addressing them costs more in money, time, and stress.
The renovation experience for prepared homeowners differs dramatically from the experience of those who rushed to start. Prepared homeowners have clear expectations because scope is documented. They have protected assets because mitigation measures are in place. They have functional lives because temporary arrangements were established before disruption began. They have working relationships with contractors because communication protocols prevent misunderstanding. They have resilience when problems occur because contingencies were planned.
Use this checklist as your timeline roadmap. Work backward from your planned construction start date to identify when each preparation step must complete. Some steps require weeks—permit applications, material ordering, contractor verification. Others can happen in the final days before construction. Sequencing your preparation creates manageable tasks rather than overwhelming chaos.
The reward for thorough preparation isn't a problem-free renovation—those don't exist. The reward is problems that remain manageable rather than becoming crises, disruption that's uncomfortable rather than overwhelming, and an outcome that justifies the effort because the process didn't destroy your wellbeing along the way.
Your renovation success is decided before the first wall comes down. The preparation you do now determines whether the construction phase that follows proceeds with controlled progress or degenerates into preventable chaos. Invest the time in preparation. Your future self will be grateful.